Both I-beam bushings are in and the the I-beams are back on the truck. Waiting for the new Kingpins and reamer to arrive. It will be awhile till they arrive, having to cross the border from the States to Canada. In the meanwhile I will clean up, sandblast and paint the brake backing plates and spindles.
Looking good. That old frame cleaned up mighty nice!!
Just another Ford fool named Dan.
The Junk that hangs around
67' F-250 highboy Camper special cross breed currently under way http://www.fordification.com/forum/view ... 22&t=86706
1974 Bronco 302 3 speed
1984 bronco 302 c6 35's
1994 F350 7.3 5spd dually.
woods wrote: The rust holes in my truck were a factory install (very rare).
Just another Ford fool named Dan.
The Junk that hangs around
67' F-250 highboy Camper special cross breed currently under way http://www.fordification.com/forum/view ... 22&t=86706
1974 Bronco 302 3 speed
1984 bronco 302 c6 35's
1994 F350 7.3 5spd dually.
woods wrote: The rust holes in my truck were a factory install (very rare).
Manny wrote:I need a dolly like that! Cab coming off soon?
I will probably take the cab off next spring, that is when I plan to do the panel work on the cab. My shop is not heated for the winter, it gets a bit costly when the temperature drops to -30C to -40C in the winter.
Manny wrote:I need a dolly like that! Cab coming off soon?
I will probably take the cab off next spring, that is when I plan to do the panel work on the cab. My shop is not heated for the winter, it gets a bit costly when the temperature drops to -30C to -40C in the winter.
Do you plan to reassemble and get it running in the mean time? Or will the project be on hold until spring??
Manny wrote:I need a dolly like that! Cab coming off soon?
I will probably take the cab off next spring, that is when I plan to do the panel work on the cab. My shop is not heated for the winter, it gets a bit costly when the temperature drops to -30C to -40C in the winter.
Do you plan to reassemble and get it running in the mean time? Or will the project be on hold until spring??
The project will probably be on hold till the spring. Will spend the winter getting body panels together for next spring. I want to price out rebuilt 302 engines also, see if I will do it myself or get a shop to do it.